Installation Guide of GeotecGrid for Retaining Wall

 

Input Date::[2011/1/17 9:01:59]    From:Geosyntech Co.,Ltd.

 
Installation Guide for Retaining Wall 
 
Before placing geogrids, excavate to the lines and grades shown on the  project grading plans and clear the ground surface of all debris or as directed  by the design engineer.
1.Install all materials at the proper elevations and orientations as shown on  the construction plans or as directed by the project engineer. The segmental  concrete retaining wall units and geogrid should be installed in strict  accordance with the block manufacturer’s recommendations.
2 Overlap of the geogrid in the design strength direction (perpendicular to the  wall face) is not permitted. Each length of geogrid must be one continuous piece of material.
All geogrid should be installed under tension in the design strength direction.  A nominal tension should be applied to the geogrid and maintained by staples,  stakes, or hand tensioning until the geogrid has been covered by at least 6  inches of structural fill. Adjacent geogrid panels should be butted on one  another to achieve 100% plan view coverage.
Place the reinforced backfill in a maximum compacted lift thickness of 8  inches. Reinforced backfill should be compacted to a minimum of 95% of the  standard Proctor density (ASTM D698) and at a moisture content within 2%  of optimum or as required in the construction specifications or as directed  by the project engineer. Only place the quantity of geogrid that can be  backfilled on that day to limit damage to the installed geogrid.
Backfill should be placed, spread and compacted in a manner that limits the  development of wrinkles or movement of the geogrid and the segmental  retaining wall facing units.
Only walk-behind compaction equipment should be allowed within 5 feet of the  back of the segmental retaining wall facing units.
 
Tracked construction equipment should not be operated directly on the  geogrid. A minimum backfill thickness of 8 inches is recommended prior  to operation of tracked vehicles over the geogrid. Turning of tracked  vehicles within the reinforced zone should be kept to a minimum to prevent  displacing or damaging the geogrid.
Rubber tire equipment may pass directly over the geogrid at slow speeds  (less than 5 miles per hour). Sudden braking and sharp turning while passing  directly over the geogrid should be avoided.
9 All drainage fill and drainage medium materials should be placed in strict  accordance with the construction plans or as directed by the project engineer.
10 Drainage collection pipes should be installed to maintain gravity flow of  water outside of and away from the reinforced zone as designed by the project engineer.
 